
Bespoke Fabrication · Completed
Crowne Plaza London Docklands
Royal Victoria Dock, London E16 1AL
Our role
A feature installation designed and delivered entirely by Sutay Structure for the Crowne Plaza hotel at Royal Victoria Dock. Starting from our own 3D structural model, the ship’s hull was fabricated in steel at the workshop, finished in a warm bronze tone, then suspended on cable rigging within the hotel atrium and dressed with integrated planting, turning the double-height space into the hotel’s centrepiece.
Designed, fabricated and installed by Sutay Structure.
Gallery





More projects
OngoingHospitality · 2025 — Ongoing
Glenthorne Hotel
End-to-end management of a full hotel development, from subcontractor agreements and procurement to design coordination.
Project & Construction ManagementSubcontractor AgreementsProcurement
OngoingHealthcare · 2025 — Ongoing
Knightsbridge Clinic & Hospital
Architectural drawings and support services for a complete clinic and hospital fit-out on Brompton Road.
Architectural DrawingsBuilding Control DocumentationProcurement Support
CompletedRetail & Hospitality · May — December 2024
Sekerci Cafer Erol
Procurement, mobilisation and site management for the European flagship of a two-century-old Turkish confectionery house.
ProcurementMobilisationSite Management
Start a conversation
Have a project in mind?
Let’s build it properly.
From planning applications to handover, we manage the whole journey, or exactly the part you need help with.
